Start a project

Construction planning tool

Project timeline estimator

Week ranges for each phase of a commercial fit-out in Ontario — design, permits, procurement, construction and closeout — adjusted for size, scope, delivery model and overnight work.

Scope
Delivery model
Building permit
Long-lead equipment

Rooftop units, electrical gear, storefront glazing, custom millwork

Working hours

Brief to opening

—

—

Bars show each phase's typical position; orange is construction. Planning ranges, not a schedule commitment.

Get a real schedule

Prefer to talk it through? Book a call with our team.

MARLICON crew in high-visibility gear on an active commercial construction site

The planning ranges behind it

PhaseRange usedAdjusted for
Brief and site survey1–2 weeks—
Design and drawings2–4 weeks (refresh), 3–8 weeks (full)Larger projects add 2–4 weeks
Tender and award2–4 weeksGeneral contracting only, runs alongside the permit
Building permit3–6 weeks (to 600 m²), 4–8 weeks (larger)Based on Ontario's 15 / 20 business-day review periods plus resubmission time
Long-lead procurement1–2 / 4–8 / 8–16 weeksOrdered mid-design on design-build and CM, at award on GC; only delays the job if it arrives after it's needed
Construction3–6 weeks (under 2,500 sq ft) up to 12–24 weeks (over 25,000)Refresh scope × 0.6; overnight work × 1.4
Closeout1–2 weeks—

The phase ranges are MARLICON planning allowances; the permit ranges start from the Ontario Building Code's prescribed review periods for complete applications. More detail: how long a retail fit-out takes.

FAQ

About this estimator.

Why is design-build faster in the estimator?

Because long-lead items can be ordered during design and there's no separate tender before construction. General contracting adds a tender and award period and orders equipment later.

Why does overnight work make the timeline longer?

Overnight shifts are shorter and include setup and clean-up so the store can open each morning. The estimator applies a 1.4 multiplier to construction time for overnight work.

Is the timeline estimator free?

Yes. The calculator is free and runs in your browser. To email or download the PDF report, we ask for your email address.

Need an opening date you can plan around?

Send the site and the scope. We'll come back with a real schedule.

Book a call

Pick a time that works.

A short call about your project, tender or program. Times shown in your time zone.

Booking is handled by Google Calendar. Trouble loading? Open the booking page.

Maintenance & refreshes

Request service

Pick whatever's easiest. Emergency? Call — crews are on site within 4 hours, 24/7.

Call226-894-2661 · 24/7, fastest for emergencies Text226-894-2661 · opens a pre-filled message Emaildispatch@marlicon.ca · pre-filled work order

Include the site name and number, address, the issue, priority, and any work order or PO number.